GUANGZHOU
 China

Guangzhou Metro Map 2007 © UrbanRail.Net

See Carl Yiu's full map with all lines under construction here

 System

The Chinese city of Guangzhou (formerly known as Canton) is the capital of the Guangdong Province and has 7 million inhabitants. It is situated in the south of the country near Hong Kong. Construction of a subway network was approved in 1989 and construction started in 1993.

Guangzhou Dong Zhan station © Kong-yan Ng near Kengkou station © Kong-yan Ng Xilang depou © Kong-yan Ng Xilang end of line © Kong-yan Ng L2 Gongyuanqian © Carl Yiu

Line 1 was inaugurated on 28 June 1999. It was built as a turnkey project by a consortium led by Siemens and has a total length of 18.5 km with 16 stations. Apart from Keng Kou and Xi Lang all stations are underground. 21 air-conditioned 6-car-trains were supplied by Adtranz. They operate in ATO-mode. The metro runs at an average speed of 36 km/h. A trip along the entire route takes 32 minutes.

Service on the central section of Line 2 (23.3 km with 20 stations - 17 underground, 2 elevated and 1 at grade) started in Dec 2002, more than a year ahead of schedule. Trains were produced by a joint venture of Adtranz and Changchun Car Company. The 26 Adtranz Movia trains were built in Germany and in China.

 

 History

28 June 1997 - Line 1 - Xilang - Huangsha
28 June 1999 - Line 1 - Huangsha - Guangzhou East Railway Station
29 Dec 2002 - Line 2 - Sanyuanli - Xiaogang
28 June 2003 - Line 2 - Xiaogang - Pazhou
26 Dec 2005 - Line 2 - Pazhou - Wanshengwei
26 Dec 2005 - Line 3 - Guangzhou East Railway Station - Kecun
26 Dec 2005 - Line 4 - Wanshengwei - Xinzao
30 Dec 2006 - Line 3 - Kecun - Panyu Square and Tianhe Coach Terminal - Tiyu Xilu
30 Dec 2006 - Line 4 - Xinzao - Huangge
28 Jun 2007 - Line 4 - Huangge - Jinzhou

 Projects

 

Line 1

Line 2

New Line 2 north extension

New Line 2 south extension

Line 8 west extension

Line 3

Line 3 North extension

Line 4 Phase 1

Line 4 Phase 2 (north and south extensions)

Line 5

Line 6

Guangfo Line

Guangzhu Line

Section

Xilang - Guangzhou Dongzhan

Sanyuanli - Wanshengwei

Jiahe - Sanyuanli

Jiangnan Xi - Xin Guangzhou Zhan

Xiaogang - Fenghuang Xincun

Guangzhou Dongzhan - Panyu Guangchang, Tianhe Keyunzhan - Tiyu Xilu

Airport North - Guangzhou Dongzhan

Wanshengwei - Xinzao

Aolinpike Zhongxin - Wanshengwei

Xinzao - Chongwei

Jiaokou - Wenchong

Xunfenggang - Yantang

Kuiqi Lu - Lijiao

Xin Guangzhou Zhan - Zhuhai

Xiaolan - Jiangmen Xi

Elevated length (km)

0

0

4.06

0

0

0

17.03

0

0

25.7

2

3.1

0

142

Aboveground length (km)

2.05

0

0

0

0

0

1.57

1.5

0

0

0

0.2

0

0

Underground length (km)

16.45

20.2

4.54

14.1

3.32

36.86

12.2

12.61

4.77

0

29.79

17.7

33

0

Total length (km)

18.5

20.2

8.6

14.1

3.32

36.86

30.8

14.11

4.77

25.7

31.79

21.06

33

140.8

Aboveground stations

2

0

4

0

0

0

4

0

0

7

2

3

0

19

Underground stations

14

17

3

9

4

18

6

5

3

0

22

17

21

0

Total no of s.

16

17

7

9

4

18

10

5

3

7

24

20

21

19

Construction start

28/12/1993

28/7/1998

6/2006

6/2005

6/2005

26/12/2001

6/2006

18/6/2003

2004 Chebei Nan – Wanshengwei

2007 Aolinpike Zhongxin Chebei Nan

2004 Xinzao – Huangge

2005 Huangge   Chongwei

2004

6/2005

10/2002

9/2005

Opened date

28/6/1997 Xilang Huangsha

28/6/1999 Huangsha Guangzhou Dongzhan

29/12/2002 Sanyuanli Xiaogang

28/6/2003 Xiaogang Pazhou

26/12/2005 Pazhou Wanshengwei

2009

2009

12/2008

26/12/2005 Guangzhou Dongzhan Kecun

28/6/2006 Kecun Panyu Guangchang

28/12/2006 Tianhe Keyunzhan Tiyu Xilu

2009

26/12/2005

12/2006 Chebei Nan – Wanshengwei

6/2010 Aolinpike Zhongxin Chebei Nan

12/2006 Xinzao – Huangge

12/2007 Huangge   Chongwei

12/2007 Zhujiang Xincheng Wenchong

12/2008

Jiaokou Zhujiang Xincheng

2008 Xunfenggang – Huangsha

10/2010 Huangsha Yantan

10/2010

2008

Power collection system

Overhead trolley bar 1500V DC

Overhead trolley bar 1500V DC

Overhead trolley bar 1500V DC

Third rail 1500V DC

Unknown

Unknown

Technology

VVVF

VVVF

VVVF

Linear induction traction motor

Unknown

Unknown

Manufactory of trains

Adtranz + Siemens

Bombardier + Changchun Car Company

Unconfirmed

Unconfirmed

Unconfirmed

Siemens + Zhuzhou Electrical Locomotive Works

Unconfirmed

Kawasaki Heavy Industries + Sifang Locomotive & Rolling Stock

Unconfirmed

Unconfirmed

No of cars

126

156

Unconfirmed

Unconfirmed

Unconfirmed

120